Saturday 11 November 2017

4mm Southern Electric

About a year ago I was punting around for a simple structure to go with the electric section of my latest book. What I found was that Hornby and Bachmann had a lot of it covered, though there is some dispute whether some of it is actually to scale or not. While substations were out then, the more common, but slightly shyer TP huts didn't seem to have been done and were fairly simple. Finding anything out about them was a bit of a nightmare and photographing was worse - by their very nature the Track Paralleling hut is generally sited on open line and in simple terms, irons out the voltage between substations. With the drop in lineside clearance of the last few years most are surrounded by a sea of nettles. Good for the railway as it puts the scrotes off from nicking the cables, bad if you want photos for a book.
The basic walling is 60 thou plastic with the door and window from Wills. The vents are simply shaped from a lump of 80 thou. The roof is a piece of brick sheet from an indeterminable maker that was so brittle that most of it went in the bin. I just managed to get this bit done, covered with tissue and painted grey.
The cheat is that what you see, is all there is - the other two walls are undetailed.
The book - 'Modelling the Southern Region 1948-present' is available here and is ideal for a stunning Christmas present.

No comments:

Post a Comment